BTS-2
Upgrade of BTS-1
•Added a 3-tonne capacity folding crane
Mounted simple square commander’s hatch that opened to the right (prototype had a commander’s cupola with a DShK 12.7 mm heavy machine gun)
| No specifications available |
Loading variants...
Main Equipment Gallery
No media available.
Loading variant media...